Artificial turf field construction requires careful planning, quality materials and professional installation. Whether for football, futsal or multi-sport use, following the correct construction process ensures a durable and high-performance playing surface.

Artificial Turf Field Construction Steps
- Ground excavation: Remove existing surface to 15-20cm depth
- Base preparation: Gravel and crushed stone layer with proper grading
- Drainage system: Install perimeter and subsurface drainage
- Geotextile membrane: Prevent weed growth and soil mixing
- Shock pad layer: Rubber underlay for impact absorption
- Turf installation: Roll out and join artificial turf panels
- Infill spreading: Apply silica sand and rubber granules
- Line markings: Stitch or paint field lines per FIFA standards
- Quality testing: Ball bounce, drainage and surface uniformity checks
Turf Types
- Monofilament: Natural look, durable, ideal for football
- Fibrillated: Cost-effective, good for multi-sport fields
- Hybrid: Combines natural grass with synthetic fibers
Cost Factors 2026
- Field size (standard: 50x30m for mini, 100x60m for full)
- Turf quality and pile height (40-60mm for football)
- Infill type (SBR rubber, TPE or organic)
- Lighting and fencing requirements
- Ground conditions and accessibility
Maintenance Requirements
- Regular brushing to keep fibers upright
- Infill level monitoring and top-up
- Debris removal and surface cleaning
- Annual professional inspection
Why EkoPark Groups?
- Turnkey construction: From excavation to final installation
- Quality materials: FIFA-certified turf options
- Professional team: Experienced installation crew
- Nationwide service: 81 provinces coverage
Contact:
Web: ekoparkgroups.com.tr
Phone: 0322 429 03 56